Readie Construction – Gazeley IDC, Magna Park, Lutterworth
Maxi RMC were appointed as the sole concrete supplier for the extensive external floor slab for Readie Construction and their site at Magna Park Lutterworth.
The project is for a new IDC within the Magna Park site which is the largest and most successful dedicated distribution development in Europe.
Using MaxiBespoke a mix design was created for the site specific requirements.
Maxi RMC also supplied a 3rd party who held the groundwork package for the project and mainly used MaxiLeanMix.