Large floor pour for new million sq ft distribution hub.
Maxi Readymix Concrete ended 2016 with a large external floor pour of over 750m3 supplied over 6 days.
The site is located in an area that is currently undergoing rapid regeneration and this site was previously occupied by the British Shoe Corporation and is being transformed into a million sq ft distribution hub.
Our customer is one of the largest floor layers within the UK and the concrete mix used was tailored to the their specific requirements. With 3 dedicated lorries to complete the deliveries the customer was extremely pleased with the consistency of supply as well as the quality of the product.